How to use Nanjing Gaochun Light Rail: Latest Hot Topics and Practical Guide
With the continuous improvement of the transportation network in the Nanjing metropolitan area, the Gaochun Light Rail, as an important project connecting the main urban area and the outer suburbs, has recently become a hot topic again. This article will combine the hot content of the entire network in the past 10 days to sort out the latest developments and practical travel information of Gaochun Light Rail for you.
1. Related data of hot topics across the entire network

| Topic keywords | heat index | Main discussion platform |
|---|---|---|
| Gaochun Light Rail Phase II Plan | 85,000 | Weibo, Toutiao |
| Line S9 operating hours | 62,000 | Baidu knows, Zhihu |
| Gaochun subway fare | 58,000 | Douyin, Xiaohongshu |
| Attractions around the light rail | 43,000 | Mafengwo, Dianping |
2. Core information of Gaochun Light Rail
The Nanjing to Gaochun Light Rail (Line S9) opened for operation in 2017, with a total length of approximately 52 kilometers and 6 stations. The total running time is approximately 35 minutes. The following are key operational data:
| Project | Details |
|---|---|
| First and last shift time | Xiangyu Road South Station 6:00-22:00 | Gaochun Station 6:30-22:30 |
| Heading interval | 8 minutes/shift during peak hours, 12 minutes/shift during off-peak hours |
| Full fare | 7 yuan (priced based on mileage) |
| Transfer station | Xiangyu Road South Station (transfer with Line S1) |
3. Recent hot topics
1.Phase II planning progress: The Nanjing Municipal Development and Reform Commission recently responded to netizen inquiries and stated that the inter-provincial line extending from Gaochun Light Rail to Xuancheng has been included in the Yangtze River Delta transportation integration planning study.
2.Peak tourist season services: During the Dragon Boat Festival holiday, the average daily passenger flow of Line S9 exceeded 30,000, and a temporary bus connection line was added at Gaochun Station directly to the International Slow City Scenic Area.
3.Mobile payment upgrade: Starting from July 1st, all gates will support Alipay/WeChat scanning code to pass through the gate, and the preferential policies for senior citizen cards will be optimized simultaneously.
4. Practical Travel Guide
1. Departing from Nanjing South Railway Station:
· Metro Line 3 → Transfer to Line 1 at Nanjing Station → Transfer to Line S1 at Andemen Station → Transfer to Line S9 at Xiangyu Road South Station
· The whole journey takes about 2 hours and the ticket price is 9 yuan
2. Recommended featured sites:
| site | Featured resources | Connection method |
|---|---|---|
| Gaochun Station | Gucheng Lake and Old Street Scenic Area | Bus No. 801/802 |
| Tuanjiewei Station | Shuimancheng Wetland Park | Tourist bus |
3. Things to note:
· Some sections of Line S9 are elevated, so it is recommended to avoid morning and evening rush hours for a better viewing experience.
· Holders of the Nanjing Senior Citizen Card can enjoy free rides during off-peak hours
· The last train transfer must arrive at Xiangyu Road South Station before 22:00
5. Future construction prospects
According to the "Nanjing Rail Transit 14th Five-Year Plan", Gaochun Light Rail will focus on the following upgrades:
| Time node | Plan content |
|---|---|
| End of 2024 | Complete the intelligent transformation of the signaling system |
| 2025 | Start the development of station commercial facilities |
| 2026-2030 | Research extended to Lishui Development Zone plan |
The Gaochun Light Rail has not only changed the traffic pattern in the outer suburbs of Nanjing, but has also become a mobile window showing the characteristics of "Slow City". It is recommended that tourists choose to travel during non-holidays so that they can not only enjoy a comfortable ride but also deeply experience the ecological beauty of Gaochun.
check the details
check the details